This 7 page paper examines a case study supplied by the student, produces a Gantt chart and a resource histogram and discussed the critical path and different problems that may be associated with the project, such as overruns. The bibliography cites 7 sources.
Name of Research Paper File: TS14_TEprocase1.rtf
Buy This Research Paper »
Unformatted Sample Text from the Research Paper:
with a base line schedule. IT is assumed that each person can only handle one task at a time, and that meeting will take a full day for the main
team, but as the trainee is involved, but not a fully functioning team member, this is not a full day for the trainee, although they are attending the meeting. The
chart has been prepared manually in excel and colour coded with the different job tasks. The project manager is overseeing the project and also present at all meetings. The Gantt
chart is shown below, each day in numbered sequentially along the top and tasks are along the side. MD Designer Author
Trainee Mixed team 1 2 3 4 5 6 7 8 Team meeting All team and MD
preliminary designs preliminary coding preliminary
search engine preliminary secured web pages meeting
gathering text based content 9 10 11 12 13 14 15
16 meeting All team proposed design and layouts
proposed coding proposed search engine gathering text